Gas rate (cu ft/h) = 3,600 × dial size (cu ft) ÷ seconds per revolution

Input (BTU/h) = gas rate × heating value (BTU/cu ft)

This is the method in Carrier's installation instructions for the 58CTA/CTX furnace (Form 58CT-12SI). Its Table 12 lists the gas rate for each time and dial size, and the input is the gas rate times the heating value from the gas supplier. The target time is the same formula run backwards from the required input.

Carrier's procedure

  • Turn off all other gas appliances and pilots served by the meter.
  • Run the furnace for 3 minutes at the stage you're checking (low heat or high heat).
  • Time one revolution of the test dial. The 2 or 5 cu ft dial gives a more accurate reading.
  • The regulator adjustment caps must be in place when you clock the meter.
  • Input must be within ±2% of the rating plate (adjusted for altitude). If it isn't, adjust manifold pressure and clock it again.
  • On the 58CTA, natural gas manifold pressure must stay between 3.2 and 3.8 in. w.c. on high heat and 1.4 and 1.7 in. w.c. on low heat. If the input can't be reached inside that range, change the burner orifices. Never re-drill an orifice.
  • Then check the temperature rise against the rating plate. See the temperature rise calculator.

Carrier altitude derate (U.S.)

The rating plate input applies up to 2,000 ft. Above that, multiply it by the factor for the altitude. Other manufacturers publish their own tables.

Altitude (ft)Multiplier
0–2,0001.00
2,001–3,0000.90
3,001–4,0000.86
4,001–5,0000.82
5,001–6,0000.78
6,001–7,0000.74
7,001–8,0000.70
8,001–9,0000.66
9,001–10,0000.62

Clocking only works on natural gas with a meter. For propane, set manifold pressure to the manual's value. See how to check furnace gas pressure.

Source: Carrier 58CTA/CTX Installation, Start-up, Operating and Service and Maintenance Instructions, Form 58CT-12SI, pp. 34-37 (Tables 11 and 12).