Hoshizaki KM-901M/1100M/1340M/1601M J Series Ice Machine Codes

Applies to: Hoshizaki KM-901M/1100M/1340M/1601M J Series (modular crescent cubers: KM-901M_J, KM-1100M_J, KM-1340M_J, KM-1601MRJ). Audible alarm beeps and LEDs on the control board (CB).

CodeMeaningWhat to check
1 beepHigh evaporator temperature (over 127°F / 53°C).A harvest problem: stuck hot gas valve or its relay, hot water entering the unit, stuck headmaster (remote units), or a shorted thermistor. How to fix →
2 beepsHarvest backup timer: harvest over 20 minutes for two cycles in a row.Open thermistor, hot gas valve not opening, TXV or liquid line valve leaking by, low charge, inefficient compressor, or the water regulating valve leaking by. How to fix →
3 beepsFreeze timer: freeze cycle past the freeze timer setting for two cycles in a row.Float switch stuck closed (up), inlet water valve or hot gas valve leaking by, pump motor not pumping, bad TXV, liquid line valve not opening, low charge, headmaster not bypassing, or an inefficient compressor. How to fix →
POWER LED blinks (red)Freeze-up detection (board 2A9678-02 only): the thermistor reached 2°C (36°F) less than 30 seconds after the freeze cycle started, or in less than 90 seconds and 40 seconds faster than the previous cycle.Work through Hoshizaki's freeze-up checklist. Hoshizaki asks you to contact its tech support (1-800-233-1940). Reset with ALARM RESET. How to fix →
POWER OK LED blinks (red)Freeze-time correction (board 2A7664-02 only): maximum freeze time differential exceeded.After 3 freeze-time correction cycles in 36 hours the yellow EXT HARVEST LED blinks too. Work through the freeze-up checklist. Reset with ALARM RESET. How to fix →
6 beepsLow voltage: control circuit at 92 VAC ±5% or less.The red LED goes out while voltage protection is active. Resets on its own when the voltage is corrected. Check supply voltage under load and the control transformer.
7 beepsHigh voltage: control circuit at 147 VAC ±5% or more.Resets on its own when the voltage is corrected. Check the supply and the transformer taps.

How to read the codes

Alarms point to a circuit, not a part. Test before replacing a board, thermistor or valve, and never bypass a safety to keep the machine running. Line-voltage work is for trained technicians, refrigerant work requires EPA 608 certification, and ice that touched a contaminated machine should be discarded.

Source: Hoshizaki Modular Crescent Cuber Service Manual, KM-901M_J, KM-1100M_J, KM-1340M_J, KM-1601MRJ, No. 73213 (revised 3-20-2026), LED Lights and Audible Alarm Safeties, pp. 71-72. The "meaning" column follows the manufacturer's wording; "what to check" is our field summary. Always go by the label on the unit you're working on.