AC and Heat Pump Startup and Commissioning Checklist

New install sign-off: pressure test, evacuation, charge, airflow, electrical and customer walkthrough on one sheet.

Follow the manufacturer's installation instructions for charge, airflow and settings. This sheet records what was done.

Saves on this device as you type. Nothing is sent to us.
Job
Equipment
Installation
Equipment matched (AHRI match confirmed)
Line set sized per instructions; length recorded
Line set lengthft
Brazed with nitrogen flowing
Filter drier installed (if required)
Condensate drain trapped, sloped and tested; float switch installed
Outdoor unit level on pad; clearances met
Disconnect, breaker and wire size per nameplate MCA / MOP
Pressure test and evacuation
Nitrogen standing pressure testpsig
Test held formin
Final vacuummicrons
Decay test: reading after 10–15 min isolatedmicrons
Charge
Factory charge (from nameplate)lb/oz
Refrigerant added for line lengthlb/oz
Superheat°F
Subcooling°F
Outdoor / indoor temperatures at check°F
Airflow and electrical
Blower speed / airflow settingtap/CFM
Total external static pressurein. w.c.
Temperature split°F
Supply voltageV
Compressor ampsA
Thermostat configured (system type, stages, O/B)
Heat pump: defrost tested; aux heat tested
Close-out
Caps on service valves; leak checked
Work area cleaned; old equipment removed
Warranty registration done or scheduled
Customer shown thermostat, filter, and what to watch for
Notes and recommendations